- Project Detail Financials track critical revenue-related data at the project and task level in real-time.
-
- New fields available for in-depth financial tracking include estimated and actual revenue, cost, and margin.
- These fields can be added to Power Grid view as columns, or used to create custom panels within dashboards at the individual project or task level.
-
- Wage Type Admin is available via Data Table Maintenance, giving administrators the ability to create multiple wage types (overtime, double time, holiday pay, etc.) and to establish an enterprise default wage setting.
- Time Allocation functionality has been added to allow administrators to reallocate hours to different wage types via a Power Grid format.
- Localized Holidays and Workdays via the Critical Path view for a project, users can configure the days of the week available for project work. They can also factor in holidays that will impact the project's timeline. Pre-populated holiday listings are available by country. Holidays can be turned on or off to customize.
- Enterprise Settings can be easily accessed via the More Option menu, giving those with rights easy access to set up organizational standards such as contact info, default values for wages, etc.
-
mPIX is now RPAX. The mPIX project score has been renamed RPAX: Robotic Project Assessment Index. The feature itself is not changing--RPAX scores will be the same as mPIX scores.
- Construction Industry Feature Addition:
- Equipment Time Tracking can now be viewed in Smart Construction Office by users with the FIELD Equipment Log permission turned on. It's available in the following formats:
- Power Grid: A Power Grid is now available for tracking time entries associated with machinery.
-
- This data can be filtered by operator, entry type, equipment type, equipment, working date, changed date, created date, progress, or cost code.
- It can be grouped by operator, equipment, equipment type, project, or cost code.
- The Power Grid will total data for working hours and total cost.
- Data can be exported as a .csv or printed as a .pdf file.
-
- Dashboard Panels:
- Equipment time can be viewed in custom dashboard panels at the Project Portfolio, individual project, and task levels.
- Power Grid: A Power Grid is now available for tracking time entries associated with machinery.
- Equipment Time Tracking can now be viewed in Smart Construction Office by users with the FIELD Equipment Log permission turned on. It's available in the following formats:
Version 14.0 - Release Notes